RHESSI Tohban report, 15-Nov-2007 to 21-Nov-2007 Albert Y. Shih, ayshih@ssl.berkeley.edu 1. Solar Activity The Sun was extremely quiet. On the 17th and the 18th, there was a weak numbered active region (10974). 2. Memory Management The SSR fill level has not been a problem. 3. Data Gaps N/A 4. Spacecraft Operations The cooldown procedure began on the 15th. The cryocooler power is being increased at appropriate temperatures as laid out in a procedure. The projected day for reaching operating temperature is either the 25th or the 26th. On the 19th, there was an ADP read error that temporarily halted the recording of aspect data until the ADP was reset. The error is suspected to be due to the cold temperatures of the IDPU and the ADP (due to the lack of power flowing through the DIB boards), which can affect timings in the communication. On following days, as the cryocooler power has increased, the IDPU temperature has crept back up, and there have been no additional errors. 5. Next Tohban: still Albert Shih