Study 000144: Engineering study which performs the following operations: 1) Configure heaters 7 to 12 to their post eclipse settings 2) Set heaters cycle time (100 seconds) 3) Turn all structure heaters *** ON *** Instructions to planners: ------------------------- 1) Run default_htrs1_6 2) Run default_htrs7_12 3) Run regeng015 (trace dump) to verify the heaters setting when needed Run on the last day of September 2026 (or as close as possible) please. Append to default_htrs1_6 on timeline. *** WARNING***: --------------- *************************************************************** * MUST run default_htrs1_6 first then default_htrs7_12 second * ***************************************************************